| 000 | 02957cam a22003614a 4500 | ||
|---|---|---|---|
| 001 | 4270116 | ||
| 005 | 20210414114050.0 | ||
| 008 | 030506s2004 maua b 001 0 eng | ||
| 010 | _a 2003010420 | ||
| 020 | _a0072919809 (alk. paper) | ||
| 020 | _a007248263X | ||
| 035 | _a(OCoLC)ocm52214711 | ||
| 035 | _a(NNC)4270116 | ||
| 040 |
_aDLC _cDLC _dYDX _dOrLoB-B |
||
| 042 | _apcc | ||
| 050 | 0 | 0 | _aQA76.9.C65 H355 |
| 082 | 0 | 0 |
_a003/.35369 _221 |
| 100 | 1 |
_aHarrell, Charles, _d1950- |
|
| 245 | 1 | 0 |
_aSimulation using ProModel. / _cCharles Harrell, Biman K. Ghosh, Royce Bowden. |
| 250 | _a2nd ed. | ||
| 260 |
_aBoston : _bMcGraw-Hill/Higher Education, _cc2004. |
||
| 300 |
_axviii, 733 p. : _bill. ; _c25 cm. + |
||
| 504 | _aIncludes bibliographical references and index. | ||
| 505 | 0 | 0 |
_gPt. I. _tStudy Chapters -- _g1. _tIntroduction to Simulation -- _g2. _tSystem Dynamics -- _g3. _tSimulation Basics -- _g4. _tDiscrete-Event Simulation -- _g5. _tGetting Started -- _g6. _tData Collection and Analysis -- _g7. _tModel Building -- _g8. _tModel Verification and Validation -- _g9. _tSimulation Output Analysis -- _g10. _tComparing Systems -- _g11. _tSimulation Optimization -- _g12. _tModeling Manufacturing Systems -- _g13. _tModeling Material Handling Systems -- _g14. _tModeling Service Systems -- _gPt. II. _tLabs -- _g1. _tIntroduction to ProModel 6.0 -- _g2. _tProModel World View, Menu, and Tutorial -- _g3. _tRunning a ProModel Simulation -- _g4. _tBuilding Your First Model -- _g5. _tProModel's Output Module -- _g6. _tFitting Statistical Distributions to Input Data -- _g7. _tBasic Modeling Concepts -- _g8. _tModel Verification and Validation -- _g9. _tSimulation Output Analysis -- _g10. _tComparing Alternative Systems -- _g11. _tSimulation Optimization with SimRunner -- _g12. _tIntermediate Modeling Concepts -- _g13. _tMaterial Handling Concepts -- _g14. _tAdditional Modeling Concepts -- _gPt. III. _tCase Study Assignments -- _gCase 1. _tToy Airplane Manufacturing -- _gCase 2. _tMi Cazuela - Mexican Restaurant -- _gCase 3. _tJai Hind Cycles Inc. Plans New Production Facility -- _gCase 4. _tThe FSB Coin System -- _gCase 5. _tAutomated Warehousing at Athletic Shoe Company -- _gCase 6. _tConcentrate Line at Florida Citrus Company -- _gCase 7. _tBalancing the Production Line at Southern California Door Company -- _gCase 8. _tMaterial Handling at California Steel Industries, Inc -- _gApp. A. _tCommon Continuous and Discrete Distributions -- _gApp. B. _tCritical Values for Student's t Distribution and Standard Normal Distribution -- _gApp. C. _tF Distribution for [alpha] = 0.05 -- _gApp. D. _tCritical Values for Chi-Square Distribution. |
| 538 | _aSystem requirements: Windows 98, ME, NT 4.0, 2000, or XP. | ||
| 630 | 0 | 0 | _aProModel. |
| 650 | 0 | _aComputer simulation. | |
| 700 | 1 | _aGhosh, Biman K. | |
| 700 | 1 | _aBowden, Royce. | |
| 856 | 4 | 1 |
_3Table of contents _uhttp://www.loc.gov/catdir/toc/fy041/2003010420.html |
| 900 | _bTOC | ||
| 942 |
_2lcc _cBK |
||
| 999 |
_c1745 _d9245 |
||